Scott worked on fixing several pieces of laminate on the kitchen counters and some electrical items through the house. He also was able to take the chest freezer from the garage today.
Craig was able to work in the bathrooms today, he put on all of the fixtures for the bath/shower.
It sure does look great, thank you everyone for such beautiful work (Kent, Craig, Braden, Scott).
Craig also worked in the Master Bath/Bedroom. He sanded down all the mud to be ready to work on the walls.
He cleaned up the bedroom with tools and supplies, we should be ready to paint this room soon.
Jared has become quite a good electrician. He has now changed all the outlets & light switches in two bedrooms and down the hallway. Thanks Jared for taking on this job and getting them all replaced, they look great!
Linda, Braden, Jared and I all spent the day painting. We were able to paint all of the hallway, finish the family room, the dining room & door, and the stairwell to the downstairs.
We were planning to finish the ceiling in the kitchen but we ran out of paint. This will need to be completed next time.
Here are all of the areas that we finished today.
Bathroom
Hallway
Dining Room / Doors
Family Room
Stairwell
It is always amazing to see all that we can get done when we have more people to help.
Thank you everyone who came down to help, things are really looking GREAT!
~Allison