Craig and Braden worked in the bathroom on plumbing, yay no leaks.
They started building the walls around the bathtub.
Soon we will be ready for tile with this cement board.
Cement board is all on and now we are ready for tile in the bathtub.
Walls are all built and we should be able to paint here soon so we can keep moving forward.
Master bedroom closet is now all built, ready to keep moving on.
Master Bath is all sheetrocked, Craig will now have to decide if the tub surround we have will fit or do we need to tile here as well, we will have to see.
Susan and I spent the entire day 8-4:00 cleaning all 12 windows in the living room and both bedrooms. While cleaning the windows we had to clean all of the tracks which were full of dirt and bugs and spiderwebs. We cleaned all of the screens as well as swept away all of the cob webs and dirt on the front of the house. Things were looking so much better outside that the neighbor across the street came over to tell us how good things were looking.
Great job everyone, one more day down, and one day closer to being finished!
~Allison
You can visit this blog at:
www.nedsprojects.blogspot.com
email: stampinaunt@gmail.com








No comments:
Post a Comment